Why supplier selection matters in custom automation
Buying a custom screw fastening system is different from purchasing a standard machine. The equipment must match the workpiece, screws, production process, target output, quality requirements, and factory conditions. A proposal that looks acceptable on paper can still fail if these variables are not verified before design.
The lowest initial quotation may become expensive when unstable feeding, unsuitable fixtures, difficult operation, or weak after-sales support causes downtime. Buyers should compare suppliers by their ability to control production risk, not only by machine price.
1-3: Verify feasibility before comparing quotations
Drawings alone cannot reveal every feeding, positioning, and fastening risk. Variations in molded parts, screw dimensions, surface treatment, hole position, and product support can affect equipment stability.
Chisu Automation provides preliminary proposal development and quotation without charge. Customers can also send workpieces and screws for a fastening feasibility evaluation before making an investment decision.
- Start with the actual product, screw, fastening positions, current process, target output, and quality requirements.
- Ask whether the supplier can test real workpieces and production screws before finalizing the solution.
- Require a preliminary technical proposal that explains the recommended machine type, feeding method, fixture concept, fastening process, and key risks.
4-6: Examine relevant experience and engineering capability
Experience with similar products can reduce unnecessary trial and error, but buyers should ask for practical evidence rather than relying only on general claims. The most useful reference is not always an identical machine. It may be a proven feeding method, fixture structure, fastening process, or inspection logic that can be adapted to the new project.
Since 2012, Chisu Automation has focused on automatic screw fastening. Its team includes nearly 40 R&D and technical engineers covering mechanical, electrical, software, and after-sales project engineering, supported by in-house sheet-metal and CNC machining capabilities in Shenzhen.
- Ask for anonymized application videos, acceptance records, or process examples involving similar products and production conditions.
- Evaluate screw feeding, workpiece positioning, fastening, quality detection, NG handling, and loading or unloading as one integrated process.
- Confirm that the supplier has coordinated mechanical, electrical, software, manufacturing, and project engineering capabilities.
7-8: Define acceptance, handover, and training
A short machine demonstration is not the same as acceptance under realistic production conditions. The acceptance standard should reflect actual loading, feeding, fastening, detection, operation, and maintenance requirements.
Every Chisu Automation machine follows a pre-shipment acceptance process. An acceptance video is provided for customer confirmation before delivery, onsite handover, and operator training. Engineers can also be arranged for overseas installation, commissioning, training, and after-sales support, including long-term service capability in Vietnam.
- Agree on cycle time, fastening quality, continuous-run conditions, alarm logic, changeover, and inspection standards before manufacturing.
- Require pre-shipment testing with real products and screws whenever practical.
- Confirm what acceptance evidence, operating documents, training, installation, and commissioning support will be provided.
9-10: Compare lifecycle support and total production risk
Chisu Automation's standard warranty is one year from acceptance and production start. Maintenance, retrofit, and upgrade services remain available throughout the equipment's operating life. Special project requirements should be confirmed in the commercial agreement.
A supplier evaluation should end with one practical question: which proposal is most likely to deliver stable production and manageable support risk after the machine enters the factory? That answer is usually more valuable than the lowest quotation.
- Review warranty scope, spare parts, maintenance responsibilities, remote support, and future retrofit or upgrade options.
- Compare labor savings, output improvement, reject reduction, downtime risk, maintenance needs, and production flexibility instead of machine price alone.
- Prepare complete RFQ information so each supplier is evaluated against the same production requirements.
Information to include in your RFQ
- Product drawings, photos, and representative samples.
- Screw specifications and samples from actual production batches.
- Number and position of fastening points.
- Current labor arrangement and production process.
- Target output or takt time.
- Torque, inspection, traceability, and NG handling requirements.
- Required automation level and connection with upstream or downstream equipment.
- Factory voltage, air supply, available space, and destination country.
Quick FAQ
Can a supplier prepare a quotation without physical samples?
A preliminary estimate may be possible from drawings and process information, but real workpieces and production screws improve feasibility evaluation, feeding tests, fixture design, and proposal accuracy.
Should buyers request an acceptance video before shipment?
Yes. An acceptance video helps the buyer review machine operation, fastening results, alarms, and agreed functions before shipment. It should support, rather than replace, the agreed acceptance criteria.